Visit your customer to ensure you're prepared for installation and launch day
Objective
Make the installation and onboarding of a Micromart Smart Store as simple as possible
- Best Location: Identify the location of the cabinet with the client
- Power & Internet: Ensure sufficient electrical infrastructure and internet connectivity
- Equipment & Food Delivery: Understand the delivery requirements for equipment & food deliveries
- Communications: Identify the best location for physical and digital collateral
๐งฐ Tools Required for Site Visit
- Measuring tape
- Smart Phone: (a) working camera (b) data plan on major carriers (AT&T, T-Mobile or Verizon), (c) ability to connect to WiFi
- Notebook + pen
Quick link: Technical Specifications (dimensions, power requirements, internet requirements etc)
๐ถ Network Connectivity (Mobile Data and WiFi)
Minimum speed requirement:
- 10 Mbps download
- 10 Mbps upload
- Perform a speed test on your cellular phone (Verizon, AT&T or T-Mobile).
- If the location provides WiFi, perform a speed test on WiFi
- Share screenshots of test results with support@micromart.com for review
Learn more
๐ Smart Store Placement
Work with the client to identify the best location for the cabinet(s). From our experience, this means:
- High-foot traffic areas or where people naturally go during their day-to-day. The space should be bright, inviting and safe for customers.
- The back of the cabinet backs against a full-height wall (no cables etc, exposed)
- At least one side of the cabinet is visible to passersby (best to include graphics of food, logo, etc.)
- Examine walls, ceiling, and floor for cracks/leaks/damage/pests
- Confirm the name of the location where the Smart Store will be installed (eg the โ2nd-floor break roomโ)
- Avoid unit installation in areas with open flames (kitchens, repair garages or the like) or in the vicinity of open flames or high surface temperatures.
- Avoid unit installation in confined spaces. Well-ventilated areas are preferred. Keep clear all ventilation opens of obstructions.
- Space in front of the cabinet (30 in)
- The door swings all the way open (handle on left, hinge on right)
- Ensure no obstruction of the door (eg hanging lamps)
- Sufficient clearance in the hallway
๐ Equipment Delivery
- Loading dock or street level (do we need a straight truck or lift gate)
- If Loading Dock: find out if there are timing restrictions, sign-in protocols, or reservations required
- If Street Level: where does the lift-gate truck park? Are there any parking/access restrictions?
- Building certifications, clearances, and insurance requirements (Workerโs Compensation / Certificate of Insurance required?)
- Building entry protocol (Concierge? Badge entry? Buzzer?)
- Route from truck location to smart store location (take photos/videos along this path)
- Accessibility and obstacles during equipment delivery
- Elevator Access/Reservation: If elevators are necessary for the move, does this need to be scheduled and put in "service mode"? Measure the elevator doors and ensure weight limitations are not exceeded.
-
- Are there any curbs, stairs, ramps?
- Low ceilings/doorways? (<7ft, take measurements)
- Narrow doors? (<32โ, take measurements)
- Client Point-of-Contact Info for Equipment Delivery (name, role, email, phone)
- Installation timing preference - typically clients don't want installations during heavy foot traffic periods (e.g. 8-10AM / 4-7PM in an apartment building, or 11-1PM in an office building)
๐ฆ Food/Product Deliveries
- Where to park during deliveries?
- If Street Level: courier parking? Visitor parking? Paid?
- If Loading Dock: timings, sign-in protocol, time limits
- Building access protocol (Concierge? Badge entry? Buzzer?)
- Client Point-of-Contact Info for Delivery (name, role, email, phone)
- Building timings (what hours can delivery drivers access the smart store)
- Route from van location to smart store location (take photos/videos along this path)
- Accessibility and obstacles during food delivery
- Elevators? (take measurements, weight restrictions, badge required or public?)
- Are there any curbs, stairs, ramps?
-
- Low ceilings/doorways? (<7ft, take measurements)
- Narrow doors? (<32โ, take measurements)
๐ Power
See: Cabinet Technical Specifications
- Are there 2 available 120V plugs? Each cabinet requires 2 plugs
- Ensure no other devices/appliances are plugged into these circuits.
- 15A dedicated circuit is recommended
- Is backup/generator power for the smart store available? (Y/N)
- Power cables are 9ft long. Ensure that the cabinet can be placed in a manner where power is accessible without an extension cable and that the power cables can be covered (to prevent accidental unplugging